The Project: Marion Road/Anzac Highway/Cross Road Electrical Relocation
When: mid 2024 – early 2025
The Scope: Installation of new electrical pit and conduit infrastructure and stobie pole footings for
the relocation of overhead powerlines to underground
The Highlights: Multi-way directional bores up to 10 x 125mm conduits – 2 x Multi-way Tram line
undertrack directional bores – Stobie pole footings up to 3.8m deep – Multi conduit trench runs up
to 10 x 100mm conduits – 10 x 125mm directional bore across Anzac Highway – Reinstatement to
DIT specifications – High traffic intersections