Avoca Dell Telstra River Crossing

Project Name Client Expertise Year Location
Avoca Dell Telstra River Crossing Telstra Horizontal Directional Drilling 2017 Avoca Dell, SA
Photographer
TPC
Project Value : $250,000

TPC has recently been engaged to replace a damaged optic fibre cable that runs beneath the Murray River at Avoca Dell – Murray Bridge. With over 20+ years of experience in Horizontal Directional Drilling (HDD Technology) TPC were able to install a new conduit under the Murray River for over 300m and at a depth of 13m.

TPC has also been contracted by Telstra to replace damaged optic fibre cables throughout South Australia and the Northern Territory utilising a vast array of civil technology including Rock Sawing, Cable Ploughing and Directional Drilling.